Porter Group Dandenong Hardstand
We were engaged to remediate a machinery holding yard and hard stand which involved the complete removal of the existing materials, preparation of the sub grade. Then we supplied ,installed and compacted new material.
Suez liner buffer sand placement
On this project we used posi tracks to move and place buffer sands to a depth of 350mm across a landfill liner cell. The requirement for light machinery meant dozers were not allowed on the liner and the sand had to be stockpiled at the front of the cell meaning a 150mtr run...
Wangaratta Landfill gas well drilling and passive gas installation
On this project we installed passive gas strip drainage across a rehabilitated landfill cell. We installed HDPE wells to extract the methane gas and a HDPE collection system which ran back to a flare. We were also engaged to conduct trenching for liner anchoring.
Winslow Bendigo passive gas system
This project involved the installation of strip drains and geo netting drainage on a former landfill rehabilitation project for Winslow Constructions. We were also engaged to undertake the trenching for the liner anchoring.
Liner trenching and installation
Here we excavated anchor trenching for a landfill liner cap and a renewal of a leachate pond holding dam.
Discharge pump and recirculation system
Here is a recently completed discharge/recirculation and transfer system we’ve completed. Whilst it’s been challenging today was a great result to see it commissioned, along with a happy customer
Hydro Excavation
We were engaged to provide excavation and concreting services for new pads in the power generation area of a renewable energy yard. During excavation works unidentified power, water and compressed air lines were uncovered. To ensure the job continued safely to meet strict timelines...
Landfill Gas Well Drilling
This was one of our first major projects undertaken. It involved the drilling and installation of 14 landfill gas wells, condensation traps and gas flow lines. We have since been involved in a major project involving the drilling and installation of 40 gas wells at Cleanaways Melbourne...
Fraser Road rehabilitation project.
Butt welding over 400 mtrs of 900mm diameter pipes on the Shamrock Civil Fraser Rd rehabilitation project. We were lucky enough to have the first use of Fusion Hire and Sales ( FHS) brand new 1000 mm butt welder to undertake this project. As part of the q.a process we pressure tested the pipe line upon completion to ensure its integrity.
Fraser Rd Clayton Landfill Project
Landfill gas well raising we are undertaking as part of the rehabilitation works being conducted by Shamrock Civil on the Fraser Rd Clayton Landfill.
Dooen Landfill Leachate Collection System Project
This was a landfill cell leachate collection system KLM Civil supplied and installed for Shamrock Civil as a part of their Dooen landfill cell construction.
Residential Site cut
New home owners needed the front area cleared of all trees. Then landscaped including a large site cut. We cut and moved all vegetation with the excavator and grab. We then levelled and spread the excavated material to level out the hilly block.